Frequently Asked Questions

  • Do you replace or sell single units (e.g. pantry, magic corner, handles bench tops)?

    We specialise in the sale of complete kitchens and wardrobes and entire new house lots, however if we have recently completed your project and you wish to add to it we can assist. We can supply laminate bench tops and if you require assistance with installation we can recommend tradespersons to you.

  • What is the standard depth?

    We recommend a minimum depth of 600mm. Our end panels are 600mm deep. Most housebuilders set their wardrobe systems at 600mm

  • How high and wide can I go with a wardrobe?

    Our sliding doors are made according to the overall height and width of the actual space
    The maximum height is 2490mm and the maximum width is 5000mm.

  • What colour options and choices are available?

    Please view our brochures by clicking on the link or visit our showroom to view all options available. If you are happy to provide us with some sizes we can give you a quote immediately subject to check measure or we are happy to come on site and give you a free quote.

  • Do you sell appliances on their own and can we provide them ourselves if we want to?

    We can offer appliance packages including sinks at competitive prices or alternatively you can provide the appliances.

  • How long from when I place my order will it take for my sliding wardrobes to be ready?

    Approximately 2-3 weeks

  • Will you install the sliding wardrobes for me?

    We can arrange for installation if you wish or you may install yourself. Each of the sliding doors is fully assembled with top and bottom rollers.. The wardrobe doors are not heavy but as they can be up to 2440mm high, general handling and locating them into the finished position is much easier with two people. As a guide a door measuring 2100mm height x 2000mm wide weighs approximately 12kg. An average time for fitting a three door sliding system will be 2-3 hours. If you are incorporating an end panel allow a further 1-1.5 hours. 

  • How long does the average kitchen renovation take?

    We suggest that customers allow for 4-5 weeks from the time they have finalised their colour selection and completed a quotation acceptance notice. Allow 1-2 days for installation.

Can't find what your looking for?